A specialist complement, not a replacement
The protocol starts with available records, an interview, source-oriented inspection and trigger matrix. It does not replace the home inspector, laboratory or regulated expertise that may be required.
- Seller disclosure and loss history
- Age, renovations and materials
- Ventilation, combustion and garage
- Moisture, odours and growth indicators
- Water source and plumbing
- Work planned after purchase
Eight modules in one portrait
Each module is declared assessed, not triggered, limited or pending. This transparency prevents a short visit from being presented as a whole-building guarantee.
- Indoor air and ventilation
- Moisture and mould
- Asbestos
- Lead
- Drinking water
- Radon
- Combustion and particles
- Other site- or use-related risks
Two conclusion levels
P means Provisional Portrait: some analyses or long-term measurements are pending. C means Completed Assessment: every triggered module has acceptable evidence or a clearly recorded limitation.
- Urgent purchase decisions flagged separately
- Justified sampling and chain of custody
- Contextual interpretation of results
- Corrective actions ranked by priority
- No guarantee that a contaminant is absent

